The firms Civic Architects & Bright Urban Futures designed a public pavilion on the central pier in the old city harbour and serves as a landmark for recreational boats and yachts, visiting the city.
The heavy roof edge, designed by CIVIC Architects and BRIGHT Urban Futures, forms an integral solution for the engineering of the structural system: in order not to affect the historic wooden foundation of the quay, the columns are positioned inwards, with two meters distance. The overhangs are accommodated by constructing the viewing deck’s solid steel balustrades as structural beams which also carry the floor of the deck.
 
A very Miesian project, resounding, minimal and clear in its image, an excellent reference for the Tilburg harbour.
 

Descripción del proyecto por CIVIC Architecture Description of project by CIVIC Architecture

With the start of 2018, a new iconic structure was opened to the public in Tilburg (Netherlands). The structure forms a public pavilion on the central pier in the old city harbour and serves as a landmark for recreational boats and yachts, visiting the city. The firms Civic Architects & Bright Urban Futures designed a striking steel structure that unites the public viewing platform and the restaurant, adding a piece of sturdy architecture to the harbour vista.

Elevated public space

The structure facilitates a special combination of public and private activities on a unique site in the city. The central pier in the harbour was built for grain transhipment in the early 20th century, but became a place for public events and leisure activities, in more recent times. Today it has been transformed into a place where the restaurant RAK shares space with a public plateau that also covers the public space on the pier. The structure benefits from the qualities of the pier in various ways: The restaurant is positioned close to the water and offers visitors a beautiful view, while keeping 2/3 of the plot area open for public use. The roof structure also provides for the viewing deck, and acts as a shelter for the rain. As a result, events and leisure activities can take place in various ways.

A contextual icon

The design of the iconic pavilion is rooted in the historic harbour and its characteristic atmosphere: The inert black cargo ships and the robust bridges form a set of iconic attributes in the harbour park. The straightforward shape, the robust structure, the matt black façades and the combination of steel and wood are magnifications of the site and its surroundings. The shape and details of the structural platform where a result of an integrated design process, where several needs were combined in one architectural element: from floor separations to sun protection. The pavilion thus becomes a simple and self-evident iconic part of the public space in the Piushaven Harbour.

Solid structural architecture

The heavy roof edge forms an integral solution for the engineering of the structural system: in order not to affect the historic wooden foundation of the quay, the columns are positioned inwards, with two meters distance. The overhangs are accommodated by constructing the viewing deck’s solid steel balustrades as structural beams which also carry the floor of the deck. Fixed structural joints and the absence of stability walls ensure a free floor plan layout, while the oversized structure allows for high intensity public use of the deck. The structure is the architecture and thus forms a powerful addition to the Piushaven harbour, built to last.



Read more
Read less

More information

Label
Architects
Text
Civic Architects (Jan Lebbink, Rick ten Doeschate, Ingrid van der Heijden, Gert Kwekkeboom, Fernanda Romeu, Angela Solis, Niels Boswinkel) y BRIGHT Urban Futures (Gerjan Streng).
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Partners
Text
Archimedes Bouwadvies, BAM Bouw en Techniek, Janssen Lastechnieken.
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Program
Text
Restaurant, Elevated public deck, terras, boat jetty.
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Area
Text
260.0 m².
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Commission
Text
Full Commission.- SD, DD, CDs, CA.
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Dates
Text
November 2015 - December 2017.
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Client
Text
Orion Projectontwikkeling, The City of Tilburg.
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Photography
+ + copy Created with Sketch.
- + copy Created with Sketch.
CIVIC ARCHITECTS, lead by Jan Lebbink, Gert Kwekkeboom, Ingrid van der Heijden and Rick ten Doeschate, focuses on the production of public buildings and spaces. The practice pursues an architecture that is rooted in time, typological innovation and a strong material usage. Their team-members bring in a broad spectrum of expertise. Unceasingly analysis, testing grounds en fast forward engineering make their designs flexible, time specific and provocative.
 
We believe that architecture is a public interest. All buildings form part of the human environment in which people live, work and interact. Our designs therefore respect and anticipate social, cultural, economic and ecological requirements. Civic currently has a staff of ten architects led by four managing partners. We approach each design on various levels of scale and always work with and alongside the best specialists. The result is functional and aesthetically responsible architecture which will serve the needs of generations to come.

As a member of The Cloud Collective, collaboration is in the practice's DNA. They work together with our TCC partners; external experts and with their clients.

Read more
Published on: January 24, 2018
Cite: "Piushaven Harbour Pavilion Tilburg by CIVIC Architects and BRIGHT Urban Futures" METALOCUS. Accessed
<http://www.metalocus.es/en/news/piushaven-harbour-pavilion-tilburg-civic-architects-and-bright-urban-futures> ISSN 1139-6415
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...