The great floods of 2014 in China, left many isolated villages, breaking the traditional supply networks and the relationships between them. This bridge, built in Peitian, a town of more than 800 years old in Fujian Province - east China - is one of the solutions.

Donn Holohan, architect of the University of Hong Kong, has been commissioned to build the new bridge Peitian people, not only to restore the connections with other villages, but also to generate a new community meeting space.

Description of the project by Donn Holohan

Situated on the outskirts of Peitian Village, Fujian Province, China and designed to be constructed without the use of mechanical fasteners, “Wind and Rain Bridge” is a reciprocal interlocking timber structure which draws on the long tradition of wooden buildings native to the region. Each of the bridges’ 265 elements is unique and integral, assembled under the supervision of traditional carpenters, who number some of the few remaining exponents of their craft.

Peitian is one of a number of isolated rural villages distributed throughout the mountainous regions of southern China, which, following severe flooding in early 2014 saw much of the infrastructure linking its disparate communities destroyed. This project aims to reconnect Peitian village to that historic network of routes that link these isolated settlements.

The bridge creates a community space, located in the heart of the village’s fertile farmland, where local people can socialize and exchange. Opening outward towards the village, the bridge negotiates the variable terrain and provides a place of respite from Peitian’s changeable climate.

This project seeks to offer an alternative mode of community redevelopment that references local crafts and traditions, and utilizes sustainable materials and methods, to create both social and physical infrastructure. Critical to this process is the integration of digital design methodologies, which allow for the planning and testing of complex assemblies. The high level of training and labor associated with these assemblies has been a barrier to the continued viability of complex, long-span, timber structures in China and other developing and transitioning economies.

Supported by the Gallant Ho Experiential Learning Fund, and integrated within the University of Hong Kong’s introduction to architectural design course, The Peitian bridge project took 70 students to southern Fujian to aid in the construction of this community structure.

Read more
Read less

More information

Label
Architect.-
Text
Donn Holohan/University of Hong Kong

+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Project team.-
Text
Jiang, Hejia (Team Leader) Man Ho Kwan, HKU Architecture Students, Rosalia Leung, Chang Liu, Elspeth Lee
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Construction.-
Text
Peitian Community Craftsmen, Gengxin Village Co-creation


Project Year
2016
Photographs
Courtesy of HKU
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Funding.-
Text
Supported by the Gallant Ho Experiential Learning Fund, HKU
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Cost.-
Text
85,000 RMB
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Area
Text
20.0 sqm
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Year.-
Text
2016
+ + copy Created with Sketch.
- + copy Created with Sketch.
Published on: July 12, 2016
Cite: "Wind and Rain Bridge by Donn Holohan - The University of Hong Kong " METALOCUS. Accessed
<http://www.metalocus.es/en/news/wind-and-rain-bridge-donn-holohan-university-hong-kong> ISSN 1139-6415
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...