The Cube – a residential tower designed by Orange Architects for the Lebanese development corporation Masharii – is located on a prominently visible location on Plot 941 in Sin el Fil, an eastern district of Beirut, Lebanon.

The concept of the 50 meter high tower is simple but effective: “maximize”, making optimal use of the client’s wishes, the site’s potential, the local building code and the views on Beirut and the Mediterranean.

"The Cube is presenting a whole new level to the concept of high rise, or the architecture of towers. No extrusion of a singular floor plan, but a unique and iconic sculpture of individual villas, all with perfect views on the centre of Beirut," said Orange Architects and adds "Each level consists of one or two apartments. The single apartments have the fabulous opportunity to enjoy Beirut from a 360 panorama. The rotation of the volumes on each level offers residents magnificent outdoor areas on the roof of the apartment below, as well as panoramic windows up to 12 meters wide."

‘The Cube is an instant classic for Beirut, expressive, iconic and innovative.’

The design with the 14 stacked and rotated floor plans generates 19 attractive apartments in total, ranging in size from 117 to 234 m², with fluid space, large balconies and wall to wall window frames. With its setting on the edge of the city both the view on the Cube itself and on central Beirut are unseen; the vibrant City is your personal wallpaper, day and night.

Thanks to the fixed core with lifts and staircases at the heart of the building, there are no constraints on the layout of the apartments. The floors run straight from the core to the facades, which are on each floor composed of two supporting concrete girders and two panoramic window frames, consequently rotated 90 degrees per level. Both the crossing girders and the core serve to stabilize the tower, an extra challenging task in a seismologically active area.

The white coated girder walls, which are perforated, strongly determine the appearance of both the exterior and the interior of the building. The parking garage is located underground in three layers and partly set into the adjacent hill. On the ground floor the recessed space for the lobby is covered by a spectacular cantilevering volume, creating a nicely covered place and marking the generous entrance of the Cube.

CREDIT. TECHNICAL SHEET.-

Architects.- Orange Architects
Team.- Michiel Hofman, Patrick Meijers, Jeroen Schipper
Structural.- Rodolphe Mattar. Technical drawings.- CBA Group
Client.- Masharii SAL, Karim Jabbour
Contractor.- K.Abboud
Quality control.- Apave
Area.- 5,600 sqm
Completion.- 2015

Read more
Read less

More information

Label
Architects
Text
Orange Architects
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Team
Text
Michiel Hofman, Patrick Meijers, Jeroen Schipper
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Structural
Text
Rodolphe Mattar. Technical drawings.- CBA Group
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Client
Text
Masharii SAL, Karim Jabbour
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Contractor
Text
K.Abboud
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Quality control
Text
Apave
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Area
Text
5,600 sqm
+ + copy Created with Sketch.
- + copy Created with Sketch.
Label
Completion
Text
2015
+ + copy Created with Sketch.
- + copy Created with Sketch.
Published on: February 15, 2016
Cite: "The Cube by Orange Architects" METALOCUS. Accessed
<http://www.metalocus.es/en/news/cube-orange-architects> ISSN 1139-6415
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...
Loading content ...